Find where the revised plan adds excavation
Lay the revised plan beside the premark photos and the excavation description on the existing ticket. Say the shell stays put but a relocated equipment pad sends the trench past the white marks. Flag the added ground on the plan and keep the changed work on hold. Dig Safe requires another permit before excavation outside the premarked area. Massachusetts member utilities must mark 15 feet beyond the premarks, and the extra markings leave the permitted excavation boundary where it was.
Premark the added trench and get a new ticket
Have the excavator premark the added ground before requesting a new Dig Safe ticket. Confirm the premarking procedure and the earliest start time with Dig Safe. Its FAQ states that Massachusetts requires at least 72 hours’ notice, excluding weekends and legal holidays. Contact any relevant nonmember utilities directly, and give any affected private locator the revised drawing. Verify that the notice period has elapsed and check that the relevant locate responses cover the changed work before releasing it.
Hand the foreperson the current plan
File the plan revision, new ticket number, and the results of the utility and private locate checks. Replace the old drawing in the crew packet. At the briefing, have the foreperson point out the added trench and review the marks and responses for that area, including any unresolved private locate issue that keeps work on hold.