Ask for the drawing that shows where soil will move
At your layout appointment, ask the builder to show you the intended excavation limits on the yard plan. Start with the fiberglass shell, then ask about the planned equipment trench, fence post holes and any patio work that involves digging. If another contractor will handle one of those items, ask who will coordinate its premarking and locate request. This is a good time to catch a missing work area while everyone can still point to it on the ground.
Follow the route from the shell to the equipment
Suppose the pool sits behind the house and the filter is planned beside the garage. During the walk, follow the builder’s proposed trench route on the drawing. If it bends around the patio and reaches the side yard, ask the builder to show you where that stretch will be premarked. Dig Safe’s homeowner guide describes using white stakes, paint or flags to identify the planned digging area before contacting Dig Safe.
Keep a copy of the layout you walked
Ask for a dated sketch or photos that show the premarked areas against features you recognize, such as the garage corner or the patio steps. If you later ask to screen the filter behind the shed, use that copy to show the builder which part of the plan you want to change before anyone revises the layout in the yard.