Skip to content
The Seasonal Pool
Standard editorial article   /   Massachusetts

Write a Private Locate Scope That Travels With the Dig Safe Ticket

Define the private locate scope for a Massachusetts pool excavation and track it alongside the Dig Safe ticket and current site drawing.

Editorial desk   ·   2026-11-24
A swimming pool with a ladder and wooden deck
Photo by Alexander Lunyov on Unsplash

Record the ticket number and drawing revision together

For a Massachusetts pool excavation, submit a Dig Safe ticket to notify member utilities and contact nonmember utilities directly for mark-outs. Dig Safe provides notification, and member utilities mark only lines they own or maintain. Arrange for a private locating company to locate privately owned lines. Attach the current site drawing to the private work order, then record the drawing revision and Dig Safe ticket number together in the job file.

Define the areas and suspected lines to check

Show the shell excavation, equipment pad and proposed trenches on the drawing. For a fiberglass pool across an old garden, an owner might remember an irrigation feed running from the house valve box toward a bed behind the pad. Mark the reported endpoints, label the route as unverified and include any owner photos or records. Ask the locator to document where the line was marked, where tracing stopped and which areas were inaccessible.

Assign follow-up before scheduling excavation

If the locator checked the shell area but a locked gate blocked access to part of the trench, assign someone to arrange entry and confirm the follow-up scope with the private locator. Have the locator document the results against the current drawing. Keep the affected trench off the excavation schedule while the locating question remains open.

Sources