Skip to content
The Seasonal Pool
Standard editorial article   /   Massachusetts

Will Lee’s Building Inspection Office Handle Your Pool Permit?

Find the Lee office for a backyard fiberglass pool permit and learn what to bring when your patio is planned in two phases.

Editorial desk   ·   2026-11-24
A swimming pool with a ladder and wooden deck
Photo by Alexander Lunyov on Unsplash

Start with the Lee office

Yes, the Shared Building Inspections Department handles the building permit for a backyard fiberglass pool at a confirmed Town of Lee address. The department says private residential pools require permits and lists Lee, Lenox, Great Barrington, Stockbridge, Becket and New Marlborough in its shared-service description. Call the Lee office at 413-243-5518 to schedule an appointment with an inspector. Have your street address and parcel ID handy so staff can identify your property.

Show the patio in both phases

If your installer’s quote includes a short apron and you plan to add a larger patio later, sketch both footprints and label when each would be built. Show where the pool shell, equipment and barrier would sit when the pool first opens. Ask the inspector which work belongs in the first application, what drawings to submit and whether the later patio needs a separate filing.

Give your installer the filing instructions

Send your installer the office’s instructions and the sketch you discussed. Agree on who will file the application and request inspections, then check the permit status and inspection schedule before arranging shell delivery. If you’re unsure which town the parcel is in or the work crosses a municipal boundary, see “Verify the Permit Contact for a Berkshire Pool Job Near a Town Line.”

Sources