Before you hand over a fiberglass pool in Massachusetts, give the crew handling its first winter closing a record for that job. List who is responsible, what equipment is installed, where to find the lines and valves, and which manufacturer instructions apply. The handoff fields below are editorial recommendations.

Give cover installation and equipment preparation separate entries

Latham’s guide distinguishes putting on the cover from winterizing the pool. It describes winterizing as including equipment shutdown, water balancing, and removing water from lines and vessels. [Latham Pool winterization guide](https://www.lathampool.com/resources/pool-maintenance-hub/how-to-winterize-a-pool/)

**Cover installation.** Record the installed cover’s make and model, where the hardware is stored, and where to find the cover instructions. Enter the assigned person or company and mark the work as pending or complete. Flag any missing hardware or unresolved fit questions.

**Equipment and line preparation.** List the make, model, and location of the pump, filter, heater, and sanitizer wherever installed. Attach a labeled photo or as-built sketch of the equipment pad, valves, and lines the crew needs to locate. Match the labels in the record to those on the photo or sketch, and flag any line or valve whose function still needs confirmation. Enter who is assigned, the status, and where to find the equipment manuals.

Point the crew to the applicable manufacturer instructions

Thursday Pools’ closing guidance points owners to its owner’s manual for recommended water chemistry levels. [Thursday Pools closing guidance](https://thursdaypools.com/blog/how-to-close-an-inground-pool/)

Leisure Pools USA provides an example of a winter closing guide written specifically for fiberglass pool owners. [Leisure Pools USA fiberglass closing guide](https://leisurepoolsusa.com/fiberglass-pools/closing-your-fiberglass-pool-tips-for-a-leisurely-winter/)

Link or attach the owner’s manual for the installed pool and identify the page or section with its water chemistry recommendations. Add the applicable fiberglass closing guide when available, along with manuals for the installed cover and equipment. Record document titles and page or section references so the crew can find the relevant instructions on site.

Sample first winter closing handoff record

Copy this recommended checklist into the job record. - **Massachusetts job address and pool model** — [street address, city or town, ZIP code, pool manufacturer and model] - **First winter closing** — [scheduled date, responsible person or company, contact information] - **Cover installation** — [make and model, hardware location, instructions, assigned person or company, status] - **Equipment and line preparation** — [equipment inventory and locations, labeled line and valve map, assigned person or company, status] - **Documents shared** — [recipient, date shared, links or file locations for the pool owner’s manual and chemistry section, applicable closing guide, and cover and equipment manuals] - **Open questions** — [question, person responsible for resolving it, date the crew needs an answer]