How to Compare Two Massachusetts Fiberglass Pool Bids for Summer 2027

Use one written scope to compare two bids for the same fiberglass pool. Get prices for excluded work, track allowances separately, and ask each builder to put the assumptions behind a summer 2027 handoff in writing.

Editorial desk   ·   2026-11-25
A swimming pool with a ladder and wooden deck
Photo by Alexander Lunyov on Unsplash

If you want to swim in your new fiberglass pool in summer 2027, use this winter to get two bids you can compare line by line. Send both builders the same written scope, ask them to price the gaps, and find out what has to happen before each can hand over a swim-ready pool.

Give both builders the same scope

List the exact fiberglass shell model, excavation, soil hauling, electrical connection, patio limits, and pool startup. Spell out where the patio should end and what you expect at startup, such as equipment testing and a walkthrough. Ask each builder to mark every line as included, excluded, or an allowance. For an allowance, ask what dollar amount is carried in the bid, what it covers, and how you’ll be charged if the final cost differs. For an exclusion, ask who will quote, arrange, and perform the work.

Price the work each bid leaves out

Suppose Bid A is $75,000 and includes soil hauling but excludes the electrical connection. Bid B is $77,000 for the same shell and includes the electrical connection but excludes soil hauling. In this hypothetical example, if the electrical quote for A comes in at $5,000 and the hauling quote for B comes in at $2,000, the comparable totals are $80,000 for A and $79,000 for B, assuming the remaining scope matches. The figures are illustrative.

Ask each builder to add the missing work to a revised bid or identify who can quote it. Record any separately quoted work alongside the builder’s price, and keep unpriced exclusions and any remaining allowance exposure visible. If a line is still open, label the total as partial so you can see exactly what remains unresolved.

Compare swim-ready dates as well as start dates

Ask each builder which crews are available for your address, the earliest plausible excavation start, and how long they expect it to take from excavation to swim-ready handoff. Request proposed start and completion dates in writing. Massachusetts’s sample home improvement contract includes a proposed start and completion schedule you can use as a reference. https://www.mass.gov/info-details/home-improvement-contract-sample-language

In the same hypothetical comparison, Builder A proposes early June excavation but assumes your electrician can make a late June connection. Builder B proposes late June excavation and includes the connection, with an estimated mid-July handoff. A’s earlier excavation date leaves the handoff open until you confirm the electrician’s availability and ask when startup can follow. Ask both builders what could shift their dates and whether their handoff estimate assumes any separately hired work is already booked.

Check the town assumptions behind each schedule

Ask each builder which applications and reviews their timeline assumes for your address, who will file them, and how much time the bid allows for review. Lee’s Shared Building Inspections Department lists permits for private residential pools and gives 413-243-5518 to make an appointment with an inspector at the Lee office. Ask the office serving your address what it needs for your project and what review lead times it is currently seeing. https://leema.gov/184/Shared-Building-Inspections-Department

Send both builders the same marked-up scope and ask for revised bids with written schedule assumptions. Before choosing, compare the totals for the same work, the costs that are still open, and the steps each builder needs to complete before you can swim. Use summer 2027 as your planning target and ask each builder when they can update their estimate as crew bookings and local reviews become clearer.