Compare bids on the same plan
Give each bidder the same dated plan and ask for separate prices for the shell and installation, delivery and equipment access, excavation, and soil handling. Ask who will stockpile or haul away excavated soil. List design, fieldwork, and filing fees separately, even when you expect to pay them directly. For each allowance, ask what quantity or scope it covers and how extra work will be priced. Put exclusions on the same comparison sheet so you can see which costs still need quotes.
Budget for the commission’s decision
Contact your city or town conservation commission before starting work in a wetland resource area or within 100 feet of a wetland. Ask the commission to clarify whether the proposed work will alter a resource area. If it determines that the work will alter one, you must file a Notice of Intent and pay an application fee. Ask what plan detail the commission requires so your designer can price the drawings and fieldwork and you can account for review in the schedule.
Price a smaller patio before signing
If the larger patio takes up the proposed soil stockpile area, ask bidders to price a smaller patio with the same shell, finish, and equipment. Compare the patio savings and any change in hauling costs. Before signing, check that the contract identifies the selected drawing by date and ties the excavation allowance to it. Get written terms for what happens to your deposit and installation date if the commission requires a revision.